Civil Construction & Infrastructure
Civil construction at AACON is a team effort that blends field expertise with precise planning and oversight. Our project managers, superintendents, and trade partners work together to deliver roadway rehabilitation, utility improvements, and site infrastructure that meet federal standards. Collaboration and clear communication guide every task to maintain quality, safety, and production across changing site conditions.
Design-Build & Facility Renovation Projects | Facility Repair & Upgrades
Demolish, Re-Asphalt and Re-Stripe the West and East Parking Lots
Department of Veterans Affairs
AACON resurfaced and re-striped the West and East parking lots, correcting subgrade failures and drainage issues. Paving and traffic control were phased to maintain patient access and daily operations throughout construction.
Green Lake National Fish Hatchery (NFH) Road and Parking Rehab
U.S. Fish and Wildlife Service
AACON rehabilitated access roads and parking areas with milling, paving, striping, and drainage improvements to support hatchery operations. Work was sequenced to preserve facility access and continuous program activity.
NFSR 300 Roadway Rehabilitation and Paving
USDA Forest Service
AACON milled, paved, and stabilized sections of NFSR-300 to improve access within the Tonto National Forest. Work included compaction, drainage adjustments, and traffic control in remote terrain with Forest Service safety and environmental constraints.
Look Rock Campground Rehabilitation for Repair
National Park Service
AACON repaired campground roads, pads, and drainage features to restore safe public access. Work included asphalt replacement, grading, and erosion control performed within sensitive park areas and seasonal access windows.
Design/Build Big Stone National Auto Tour Roadway Repairs
U.S. Fish and Wildlife Service
AACON delivered design-build roadway repairs along the Big Stone Auto Tour Route, restoring pavement, shoulders, and drainage features. Work was executed within an active refuge, maintaining visitor access and environmental protections.
Southwest National Forest System Roads Paving
USDA Forest Service
AACON paved and stabilized sections of Forest Service roads to improve public access and support land management. Work included asphalt placement, compaction, and grading in remote terrain requiring controlled logistics.
